太阳能热水机组工程 华阳厂家太阳能热水器
太阳能热水工程的检测
Safety detection of solar hot water project
完成了基础的太阳能热水工程建设工作,我们肯定也是要做好后续的检测工作,如果安装工程的时候就出现了一定的问题,那么后续太阳能热水器的使用也会受到影响。
After completing the construction of the basic solar water heating project, we must do a good job in the follow-up detection. If there are some problems in the installation project, the use of the follow-up solar water heater will also be affected.
不管我们和什么样的商家来合作,对方都是应该为我们提供后续的检测业务。
No matter what kind of business we cooperate with, the other side should provide us with follow-up detection business.
首先,按照设计图来确定好位置是否合理。
First of all, according to the design to determine whether the location is reasonable.
建议还是应该根据设计图来进行,一定要确认是否有一定的隐患,有没有没有固定的地方等等,这些都是需要进行细致检查的。如此才能够让我们确定和后续的安装不出现问题,也不会影响到设备的使用。
It is suggested that it should be carried out according to the design drawings. It is necessary to confirm whether there are certain potential safety hazards, whether there are fixed places and so on. All these need to be carefully checked. Only in this way can we make sure that there is no problem with the subsequent installation, and it will not affect the use of the equipment.
因为有很多太阳能热水工程都是直接涉及到了整个大楼的热水系统,所以说一定要进行测试。可以先将设备安装完成之后,进行整体上的热水试验,只需要简单的基础测试即可。
Because there are many solar hot water projects are directly related to the hot water system of the whole building, so it must be tested. After the installation of the equipment, the overall hot water test can be carried out. It only needs a simple basic test.
如果说能够很好的加热热水效果,后续使用自然也就是有所保障的。