商品 详情
混凝土防撞墙模具的基本知识

¥ 355

  • ≥ 5 起订量
  • 10000套 总供应
  • 河北 保定 所在地
河北宏旭模具制造有限公司
产品详情

混凝土防撞墙模具使用拉杆固定的方法,但是根据长度大小,拉杆数量以及位置是不固定的,所以为了保证上下固定的可靠,往往会增加其密度。为了保证现浇防撞墙模具、混凝土防撞墙模具的正常使用,我厂在出厂每套模板的加工时间以及制作技术都要有明确的规定,这样才不会延误工期,从而保证混凝土防撞墙的制作效果。混凝土防撞墙模具采用上面灌料的方式,这样就为了保证不变形,会在两块模板外围增加筋板的密度,从而有效的保证其使用次数。混凝土防撞墙模具的是一种组合形式的模具,整个模具是可以拆卸的,我们在运输的时候可以将模具拆卸开来,节省车辆的空间,我们在使用的时候在进行安装,主要就是将各个公路防撞墙钢模具连接在一起,连接的时候要利用螺丝将各个模具紧密的连接在一起,而且在两边要安装上挡板,这样是为了防止漏浆。混凝土防撞墙模具大样图按照高速公路的里程标准设计,有的把混凝土防撞墙模具叫做新泽西护栏模具,按照防撞墙模具的生产标准计算,每成型一块高速公路防撞墙就要等待15个小时以上,才能达到混凝土完全晒干的情况。

The concrete anti-collision wall mold uses the method of fixing the pull rod, but according to the length, the number and position of the pull rod are not fixed, so in order to ensure the reliability of the upper and lower fixation, the density will often increase. In order to ensure the normal use of cast-in-place anti-collision wall mold and concrete anti-collision wall mold, the processing time and production technology of each set of formwork in our factory must be clearly specified, so as not to delay the construction period, so as to ensure the production effect of concrete anti-collision wall. The concrete anti-collision wall mould adopts the method of filling materials on the top, so in order to ensure no deformation, the density of the reinforced plate will be increased around the two formworks, so as to effectively ensure its use times. The concrete anti-collision wall mold is a kind of combined mold. The whole mold can be disassembled. We can disassemble the mold during transportation to save the space of the vehicle. We are installing it when we use it, which is mainly to connect the steel mold of the anti-collision wall of each road together. When connecting, we need to use screws to connect the mold closely, In addition, baffles shall be installed on both sides to prevent leakage of slurry. The detail drawing of the concrete anti-collision wall mold is designed according to the mileage standard of the highway. Some people call the concrete anti-collision wall mold New Jersey guardrail mold. According to the production standard of the anti-collision wall mold, each formed anti-collision wall of the highway needs to wait for more than 15 hours before the concrete can completely dry.

首页 五金/工具 / 模具 / 成型模
相关产品
店内推荐
首页
店铺
拨打电话 立即报价
发送询价单
采购商品:
采购数量:
联系信息:
公司名称:
采购说明:
 
您的询盘第一时间将不发送给其他供应商,但该供应商24 小时未响应情况下,仍将为您分配更合适供应商
图形验证:
图形验证码 换一换
验证码校验